Thredbo Summer Maintenance Package

Alpine resort operator

Thredbo Summer Maintenance Package

Thredbo Resort | 500 tonnes | Completed 2026

Asphalt mill and fill across roads and carparks at Thredbo Resort, on a three-week program with public access maintained throughout.

Like Perisher, this was a job where the weather set the sequence of works rather than the other way around, and where a lost day could not be allowed to become a lost week. Plant was positioned and haulage timed so that every workable shift was used.

Around 500 tonnes placed, with profiling, base compaction, proof roll, bituminous spraying, asphalt placement, compaction and testing all delivered by our own crew.

Related Projects

Perisher Summer Maintenance Package

Alpine resort operator

Perisher Summer Maintenance Package

NPWS Head Office Pavements

NSW government agency

NPWS Head Office Pavements

Detail-rake-449.jpg

HAVE A PROJECT TO PRICE?

Send us:
Project location
Scope / drawings
Approximate quantities
Required timeframe
Tender closing date

PavementsAustralia-523.jpg

Everything procurement needs, in one PDF

Company details and ABN, certifications, key personnel, plant and project record. Download the capability statement, or ask us for certificates and insurances directly.

Download capability statement

bottom of page